设施管理人员如何将能源转化为收入

设施管理人员如何将能源转化为收入

This post provides the following information about MCE’s Peak FLEXmarket Program:
● How facilities can earn revenue through the program
● Strategies for shifting electricity use during peak hours
● Eligibility and how to participate

Large facilities such as schools, hospitals, warehouses, or manufacturing sites often use a substantial amount of electricity on operations such as lighting, cooling, refrigeration, or running equipment. For people who manage these large facilities, using electricity more efficiently is a key way to reduce costs, and achieve decarbonization goals.

If you’re a facilities manager, read on. With MCE’s Peak FLEXmarket program you could receive compensation for adjusting electricity use at your facility.

What is the Peak FLEXmarket Program?

MCE 的 峰值 FLEXmarket 计划 pays facilities to shift their electricity use out of 4–9 p.m. summer peak demand hours during demand response events. Demand response events include events such as Flex Alerts which are periods of particular strain on the grid when consumers are asked to reduce electricity consumption. Lowering energy use during demand response events improves the reliability of the power grid, preventing blackouts, and reducing California’s reliance on fossil fuel peaker plants.

How do you get paid?

Participants in the Peak FLEXmarket Program are paid $2.00 per kWh for energy load shedding, or shifting, during demand response events. You will receive email notifications approximately 24 hours in advance to prepare for the event. Facilities are compensated the most when the need to lower consumption is the greatest. Participation in this program can lead to significant cost savings for your facility.

MCE measures and monitors your energy savings and sends you a check based on your results in the fall.

“Aside from bill savings and supporting the grid, there is the added benefit of participating in MCE’s Peak FLEXmarket Program, which will compensate us⎯at a rate 4-5 times greater than retail value⎯for the electricity we would have otherwise used.”

How can your facility shift electricity use?

Your facility can implement a range of clean energy strategies, such as making behavioral changes, adjusting building or equipment controls, and discharging battery storage during demand response events. Electricity load-shifting strategies may include the following:

  • Adjusting HVAC controls for precooling or a modified set point
  • Adjusting the lighting dim set point, turning off zones, or delaying exterior lighting
  • Rescheduling hours of operation or equipment usage
  • Utilizing energy storage

 

How can you participate in the Peak FLEXmarket Program?

Facilities must meet the following criteria to be eligible for participation:

  • You are in MCE’s 服务区.
  • You have a dedicated staff member able to support energy usage changes at your facility.
  • You have a SmartMeter that generates interval data for the previous 45 days prior to any event day, and continues through 15 days after an event. MCE screens each site for data sufficiency.
  • You are not currently participating in another demand response program.

Join MCE’s Peak FLEXmarket Program to reduce your facility’s energy costs and contribute to a cleaner, more reliable grid! Complete the Peak FLEXmarket Interest Form to determine if the program is right for your facility.

空缺职位

申请保留 MCE 紧急热水器奖励金

承包商,请填写以下所有必填字段。您必须为申请预留资金的每个项目提交信息。请确保您和您的客户选择安装的热泵热水器符合以下条件 TECH Clean California 批准名单.

选择至 MCE Deep Green

选择加入 MCE Light Green

能源供应项目开发

请填写下面的兴趣表,开始行动!

请填写下表,表达对我们的 EV Instant Rebate 的兴趣,或提出任何有关电动汽车或电动汽车激励措施的问题。我们的合作伙伴 Energy Solutions 将在 2 个工作日内给您回复。

营销、社区外联、创意和活动制作

能效、电动汽车和负荷转移计划的实施与评估

与能源无关的服务和建筑

与专门的能量教练联系

技术、财务和人力资源