谨防诈骗。 MCE 不参与敲门推销太阳能。我们的能效计划合作伙伴将提供识别服务。

Turn Energy into Revenue

填写兴趣表即可开始!
MCE collaborated with Contra Costa County to reduce their energy during demand response events.

Improve Grid Reliability and Reduce GHG Emissions

MCE’s Peak Flex Market program pays you to reduce or shift your energy usage when the grid is most constrained. Starting in June through October, you will be paid $2.00 per kWh for load shedding or shifting from 4 pm to 9 pm during demand response events.

您将获得

Payment for every kWh saved
Improved grid reliability
Reduced greenhouse gas emissions

谁有资格

  • MCE commercial, industrial or municipal customers
  • Have a dedicated staff member able to influence energy usage at your facility
  • Have a SmartMeter that generates interval data. MCE will screen each site for data sufficiency
  • Not currently participating in another demand response program

如何使用

mce_green-circle-number-1

联系能源专家

Complete the interest form below. We’ll determine if your facility can take advantage of the program.

mce_green-circle-number-2

Implement your strategies

Once we’ve determined eligibility, implement a wide range of clean energy strategies, including changing behaviors, adjusting building or equipment controls, and discharging battery storage to respond to demand response events. Diesel generators and natural gas-fired solutions are prohibited. MCE will notify you 24 hours in advance to prepare for the demand response event.
mce_green-circle-number-3

Receive your payments

We’ll measure your energy savings using meter data and analytics to accurately calculate your hourly energy savings, and send you a check with your measured results after the season ends.

有问题吗?

联系我们 info@mceCleanEnergy.org 或致电 (888) 632-3674,周一至周五上午 9 点至下午 5 点。

查找更多 MCE 业务解决方案

MCE 为您提供了许多既省钱又环保的机会。探索并了解更多。

探索 MCE 的所有计划和优惠。

了解更多
通过 MCE 找到更多节省开支的方法。
查看我们是否为您所在的地区提供服务。
了解更多
不确定您是否是 MCE 客户?
访问我们的商业资源中心。
了解更多
寻找更多资源?

Fill out the interest form to get started!

空缺职位

申请保留 MCE 紧急热水器奖励金

承包商,请填写以下所有必填字段。您必须为申请预留资金的每个项目提交信息。请确保您和您的客户选择安装的热泵热水器符合以下条件 TECH Clean California 批准名单.

选择至 MCE Deep Green

选择加入 MCE Light Green

能源供应项目开发

请填写下面的兴趣表,开始行动!

请填写下表,表达对我们的 EV Instant Rebate 的兴趣,或提出任何有关电动汽车或电动汽车激励措施的问题。我们的合作伙伴 Energy Solutions 将在 2 个工作日内给您回复。

营销、社区外联、创意和活动制作

能效、电动汽车和负荷转移计划的实施与评估

与能源无关的服务和建筑

与专门的能量教练联系

技术、财务和人力资源