Hüten Sie sich vor Betrug. MCE beteiligt sich nicht an Türklopfen für Solaranlagen. Unsere Partner im Energieeffizienzprogramm sorgen für die Identifizierung.

Charged by Public Power

MCE staff in the community at Richmond’s Earth Day Celebration.

Community Voices and Choices

MCE’s Charged by Public Power program is working with the community to expand access to clean transportation solutions — such as EV chargers, carshares, and bike shares — in historically underserved communities.

With help from the Community Electric Transportation Council, local agencies, and community-based organizations throughout Contra Costa, Marin, Napa, and Solano Counties, our Charged By Public Power program is working with our partners to determine transportation needs and design inclusive community outreach plans in these priority communities:

  • Concord
  • Fairfield
  • Napa
  • Pittsburg
  • Richmond
  • San Pablo
  • San Rafael
  • Unincorporated Contra Costa County
  • Vallejo

Community Benefits

MCE’s Charged by Public Power program is helping to promote the following benefits in our local communities:

Cost Savings — Clean mobility solutions are often more affordable alternatives to owning and operating a gas-powered vehicle.
Improved Accessibility — Better access to essential services, education, and employment opportunities through improved transportation.
Gesündere Umwelt — Reduced greenhouse gas emissions, air pollution, and reliance on fossil fuels.
Social Connectivity — Encourage interaction and connectivity throughout your community.
Equity and Inclusivity — Ensure that transportation services are available to all residents.

Wer ist förderfähig?

If you’re 18 years or older and reside in Concord, Fairfield, Napa, Pittsburg, Richmond, San Pablo, San Rafael, Vallejo, or unincorporated Contra Costa County, we encourage you to join one of our focus groups.

Wie es funktioniert

mce_green-circle-number-1

Sign up for a focus group

Fill out the focus group interest form to start the eligibility process. MCE will reach out to verify your eligibility and provide more information.

mce_green-circle-number-2

Share your thoughts

Engage in discussion and collaborate with other community members on clean transportation solutions. The focus groups will take place December 2024 to January 2025 throughtout Contra Costa, Marin, Napa, and Solano Counties.

Treffen Sie unseren Partner

The Community Electric Transportation Council is made up of representatives from local governments, transit authorities, and community-based partners. In partnership with MCE, the CETC is responsible for supporting the development of community engagement strategies, outreach, and recruitment for the transportation survey and focus groups that will guide clean transportation options in your community.

Noch Fragen?

Kontaktieren Sie uns unter info@mceCleanEnergy.org oder telefonisch unter (888) 632-3674, Mo-Fr von 9 bis 17 Uhr.

Häufig gestellte Fragen

Planning & Community Engagement 2024 Installation & Commissioning 2025 Deployment & Operations 2026
  • Develop engagement strategy with input from the CETC.
  • Engage communities and residents through survey and focus group participation.
  • Analyze and report survey and focus group findings to the community.
  • Refine implementation plans with additional feedback from the community.
  • Install EV chargers and stations at identified sites.
  • Ensure efficient operation of EV chargers and stations.
  • Coordinate access to other identified clean mobility solutions. identified during community outreach activities.
  • Provide ongoing support for communities where projects were installed.
  • MCE staff used a combination approach to evaluate disadvantaged priority communities. To avoid depending too much on any one dataset, MCE used four different datasets that apply different criteria for assessing “disadvantaged.” These datasets are:

    1. The U.S. Department of Energy’s Justice40 Energy Justice tool
    2. The White House’s Council on Environmental Quality (CEQ) Climate and Economic Justice Screening Tool (CEJST)
    3. California’s Office of Environmental Health Hazard Assessment’s (OEHHA) CalEnviroScreen (CES)
    4. The California Air Resource Board’s Priority Population Investments

    Thank you for your involvement! Here are links for previous meeting recordings und presentations.

    The program is funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE) under the Vehicle Technologies Office (VTO).

    Planning & Community Engagement 2024 Implementation Installation & Commissioning 2025 Deployment & Operations 2026
  • Develop engagement strategy
  • Engage the CETC, communities, and residents through the Community Transportation Needs Assessment and focus groups
  • Analyze and report survey and focus group findings to the community
  • Install EV chargers and stations at identified sites
  • Refine implementation plans with additional feedback from the community
  • Ensure efficient operation of EV chargers and stations
  • Coordinate access to other identified clean mobility solutions
  • Provide ongoing support for communities where projects were installed
  • CETC members include:

    Thank you for your involvement! Here are links for previous meeting recordings und presentations.

    The project is funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE) under the Vehicle Technologies Office (VTO).

    Besuchen Sie PG&Es Website and ensure that your contact information is up to date. PG&E will notify you via your preferred contact method before a planned PSPS outage event.

    There is no set time for a PSPS event — it varies based on the prevailing conditions. It is also possible to experience back-to-back outages, where power may be briefly restored before being turned off again due to another event. PG&E recommends preparing for outages lasting up to 7 days.

    The California Foundation for Independent Living Centers offers PSPS resources to qualifying customers who may need help evacuating in the event of a power shutoff.

    Make sure you have an emergency plan in place. Prepare for any medical needs, build or restock an emergency kit with nonperishable food items, water, batteries, and a first aid kit, and fully charge your electronic devices. You can see a full list of recommendations at prepareforpowerdown.com.

    Offene Stellen

    Antrag auf Reservierung der MCE-Notfall-Wassererhitzer-Prämie

    Auftragnehmer, bitte füllen Sie alle erforderlichen Felder unten aus. Die Angaben müssen für jedes Projekt gemacht werden, für das Sie Mittel reservieren möchten. Vergewissern Sie sich, dass die Wärmepumpen-Wasserheizung, die Sie und Ihr Kunde installieren wollen, in der TECH Clean California-geprüfte Liste.

    Optimal für MCE Deep Green

    Anmelden bei MCE Light Green

    Entwicklung von Energieversorgungsprojekten

    Füllen Sie das untenstehende Formular aus, um loszulegen!

    Füllen Sie das nachstehende Formular aus, um Ihr Interesse an unserem EV Instant Rebate zu bekunden oder um Fragen zu E-Fahrzeugen oder E-Fahrzeug-Förderungen zu stellen. Sie erhalten innerhalb von 2 Werktagen eine Antwort von unseren Partnern bei Energy Solutions.

    Marketing, Öffentlichkeitsarbeit, Kreativität und Veranstaltungsproduktion

    Umsetzung und Bewertung von Energieeffizienz-, EV- und Lastverschiebungsprogrammen

    Nicht energiebezogene Dienstleistungen und Bauwesen

    Verbindung mit einem engagierten Energie-Coach

    Technologie, Finanzen und Humanressourcen